steam to heat the sands and reduce the bitumen viscosity so that it can be pumped out like conventional crude oil.
The standard extraction process requires huge amounts of natural gas. Currently, the oil sands industry uses about 4% of the Western Canada Sedimentary Basin natural gas production. By 2015, this may increase 2.5 fold.
According to the National Energy Board, it requires about 1,200 cubic feet (34 m3) of natural gas to produce one barrel of bitumen from in situ projects and about 700 cubic feet (20 m3) for integrated projects. Since a barrel of oil equivalent is about 6,000 cubic feet (170 m3) of gas, this represents a large gain in energy. That being the case, it is likely that Alberta regulators will reduce exports of natural gas to the United States in order to provide fuel to the oil sands plants. As gas reserves are exhausted, however, oil upgraders will likely turn to bitumen gasification to generate their own fuel. In much the same way the bitumen can be converted into synthetic crude oil, it can also be converted into synthetic natural gas.
In-situ extraction on a commercial scale is just beginning. A project nearing completion, the Long Lake Project, is designed to provide its own fuel, by on-site hydrocracking of the bitumen extracted. Long Lake Phase 1 is extracting 13,000 barrels/day of bitumen as of July 2008, ramping towards a target of 72,000 in late 2009. and “upgrading” of bitumen to liquid oil in 2007, producing 60,000 bbl/day of usable oil. The hydrocracker is scheduled to complete commissioning by September 2008.
Environmental impacts
See also: Environmental issues surrounding oil sands exploitation
Mining operations in the Athabasca oil sands. Image shows the Athabasca
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27